-
Residential Installation Standards
-
- Join this Course to access resources
- Quiz
-
- Join this Course to access resources
-
- Join this Course to access resources
-
- Join this Course to access resources
-
- Join this Course to access resources
-
- Join this Course to access resources
-
- Join this Course to access resources
-
House Entry, House Box, and ONT Installation
Rating
0
0
There are no comments for now.
Join this Course
to be the first to leave a comment.
1.
When installing a house box, what is the minimum distance it should be from an electrical meter?
2.
When drilling the entry hole from the outside, at what angle must the hole be drilled, and why?
3.
What must be included in the house box for future easy location of the drop?
4.
When installing an ONT Wall Mounted Bracket, which type (GPON or XGS) has a pigtail that needs to be removed before installation?
5.
When installing a wall plate, what fiber component must always be used?