'One Check' Process for FTTP with VIAVI
Rating
0
0
There are no comments for now.
1.
What is the first step in the EPON Certification Process?
2.
After pressing the “New” button in the Job Manager, what two options appear?
3.
What is the name of the template used for the EPON test?
4.
How do you input the Work Order Number?
5.
How is the active Work Order identified in the Job Manager window?
6.
What is the purpose of pressing the active job in the Job Manager window?
7.
When the Job window opens, what information does it show?
8.
What should be done before pressing "Continue" on the "Confirm you are ready" pop-up window for the OneCheck Fiber test?
9.
What does a green checkmark next to a test result signify?
10.
After the OneCheck Fiber test completes, what button should be pressed to save the results?
11.
After saving the OneCheck Fiber test report, where are you returned?
12.
What is the status of a completed OneCheck Fiber test updated to in the Job window?
13.
What is the final step in the OneCheck Fiber test process before moving to the Ethernet test?
14.
What type of test does the OneCheck Ethernet app run?
15.
What is the last step in the entire process after all required tests are complete?
Share This Content
Share Link
Share on Social Media
Share by Email
Please login to share this Document by email.
Embed in another Website
Start at Page